Hello, welcome to Zhejiang Jie Li Da HVAC Technology Co., Ltd. official website!

News
abouta us

Popular science column

You are here:Home > Popular science column

"This winter is not too cold" [to warm t

  • "This winter is not too cold" [to warm t
  • 2017-02-23 18:02:01
  •    (Water heater) in the low temperature hot water ground radiation heating system role; points, the water collector is composed of water separator and water collector combination of water flow distribution and collection device. Usually in the ground heating area, the need for large area subdivision into a small block control, or a set of residential, there are multiple functional rooms, need to be controlled separately. At the same time, the floor heating system is affected by the hydraulic characteristics, the warm coil is limited to a certain length. This requires the same ground heating area or the same set of residential heating room is divided into multiple loops, and each loop and need to be shut down or flow adjustment.
        Points, the water collector http://www.chjld.com in the low temperature hot water ground radiation heating system plays such a role. It is the first side of the heating pipe water according to the needs of the building heating distribution, to ensure that the regional branch loop flow to meet the heating load needs. At the same time, but also the branch of the flow of water collection, and input heating back to the main pipe to achieve the cycle of operation. On the other hand, due to the various functional areas of the building (room) need to heat on demand. In order to facilitate the regulation and control, the water separator and the collector of the branch loop configuration of the valve, the valve to bear the flow distribution and regulation tasks. The warm structure system is buried buried heating end, most of its structure is buried in the concrete structure layer, only sub-catchment exposed on the outside. As a key component of floor heating control, its role is very important.

    Related Recommended: LCD thermostat http://www.chjld.com/index.php?s=/products/show/pid/53.html

[Zhuji water separator] save money and worry more

  • [Zhuji water separator] save money and worry more
  • 2017-02-23 19:02:41
  • Zhuji water separator use method

        1. Water divider can be divided into the control of each room or district heating temperature, the user can adjust the room according to their own temperature (see the installation of the company to provide geothermal heating road map)

        2. Water dispenser manual exhaust valve, the user can own the pipeline of gas discharge, in order to ensure the heating temperature of the pipeline.

        3. Water Separator http://www.chjld.com/index.php?s=/products/show/pid/68.html There is a filter on the front end where the user periodically or irregularly applies the filter during the annual heating The bottom of the filter removed after cleaning installed to ensure that the water inside the clean. After the heating, the application of water for pipe network rinse.

        4. At the beginning of the heating, the temperature will not be felt immediately within 12 hours. During this period, the concrete floor of the floor is gradually heated, and the heat is stored. After 2-4 days, the design temperature can be reached. Such as the user's own heating water temperature should not exceed 65 ℃.

        5. If you are not at home for a long time, you can use the total volume of the water separator will be small, do not all closed. In the whole winter if the room is not heating, should be the tube of water blowing, so as not to freeze the pipeline and water separator.

    Related Recommended: LCD thermostat http://www.chjld.com/index.php?s=/products/show/pid/53.html!


[Zhuji water separator] manufacturers to introduce

  • [Zhuji water separator] manufacturers to introduce
  • 2017-02-23 19:02:42
  • As a well-known supplier of sub-catchment (Zhuji Diversion), we have long-term operation of the product quality and reliable, excellent performance, the majority of users are recognized by the following Xiaobian for friends to introduce the next sub-collector structure.

    (A), with high precision CNC lathe production spool, concentricity, wear. Standard flow meter, automatic exhaust valve, drainage valve and other important components.

    (2), the use of hot extrusion copper plating nickel, corrosion resistance, pressure and strong ability to install the stent thick, flexible joint fittings, easy installation and maintenance, solid, greatly improving the product life and reliability The

    (3), sub-water http://www.chjld.com/index.php?s=/products/show/pid/68.html pipe water return can be adjusted, and can be installed in the branch of the installation of electric Temperature controller, geothermal thermostat, you can easily achieve intelligent control of the district.Other import brands are also integrated sub-catchment, the function is not much difference.

    Above is the sub-catchment http://www.chjld.com/index.php?s=/products/show/pid/68.html related knowledge, we hope to help.If the majority of customers need, Please call the consultation, I wholeheartedly for the majority of customer service!

    Other products: water separator ball valve http://www.chjld.com/Faq


With the [LCD thermostat] to "hot and cold al

  • With the [LCD thermostat] to "hot and cold al
  • 2017-02-23 19:02:43
  • Thermostat (liquid crystal thermostat) is based on the working environment of the temperature changes in the internal physical deformation of the switch, resulting in some special effects, resulting in conduction or disconnection of a series of automatic control components.

        Summer, air conditioning is the people's favorite, because the use of air conditioning cooling, the most efficient, it will not be the same as the fan directly to the wind blowing on the skin, but to change the temperature of the sealed space, very comfortable. However, air-conditioning power consumption amazing, an ordinary 1.5P air conditioning cooling power between 1000-1600W, if the minimum power of 1000W, one night using 6 hours, the power consumption of 6 degrees, according to electricity 1 yuan / kWh To count, open air conditioning sleep at least 6 yuan / night. So to count the words, our hair grandfather unknowingly disappeared. Now, the temperature control through research and development to improve, more intelligent design, can be unmanaged conditions, according to the surrounding environment automatically change the switching equipment, effectively save us a lot of electricity.

        Thermostat http://www.chjld.com/index.php?s=/products/show/pid/53.html The continuous improvement of the market has brought a new comfortable environment to our life, effectively changing the our life. Promote the implementation of our concept of healthy and environmentally friendly life.

    Related Recommend: Digital Thermostat http://www.chjld.com/index.php?s=/products/show/pid/54.html


[Electric ball valve] of the "welding valve&q

  • [Electric ball valve] of the "welding valve&q
  • 2017-02-23 19:02:44
  •    

    The application of electric ball valve is very wide, can be used in petroleum, chemical, metallurgy, thermal power plants and other industries.

        How the electric valve works:

        Electric valve http://www.chjld.com/index.php?s=/products/show/pid/57.html is composed of two parts, part of the electric actuator, part of the valve, Valve switching power from the electric actuator, and the electric actuator has two sets of trip switch, electric valve first run, you need to set the opening and closing valve stroke, stroke set, you can reach the open when the electric actuator automatically Stop, off in place after the electric actuator can also automatically stop to achieve automation control.

    Among them, the use of high temperature heat transfer oil or high temperature steam is mainly electric butt gate valve. Related requirements: Power supply voltage: 380V, 660V, 415V, 220V, 110V, electric actuators are: switch type, the overall type, intelligent regulation type, explosion-proof type.

        Electric gate valve main performance parameters:

    Drive: electric (with manual)

    Connection: welding

    Sealing material: hard seal (sealing surface for the hard alloy steel)

    Valve diameter: DN250

    Applicable temperature: ≤540 ℃

    Applicable pressure: 10MPa

    Body material: chrome molybdenum vanadium steel

    Electric actuator voltage: 380V

    Work system: 10 minutes in a short time (special order 30 minutes)

    Protection class: IP65

    Electric Actuator Type: Smart Adjustable Type

     Related Products Recommended: Water Separator Ball Valve http://www.chjld.com/index.php?s=/products/show/pid/82.html


39 条记录 6/8 页 上一页 下一页 首页 <<  678

Home  |  Jie Lida water separator  | about us  |  Products  |  Download  |  Careers  |  Technical Support  |  contact us

浙ICP备10003325号 Zhejiang Jie Lida Pipe Industry Co., Ltd Contact: Li Yunhai mobile number:13606852630 phone:0575-87669088 fax:0575-87669008

Address: Zhejiang Province Zhuji City shop town Yang Yan Road Zip code:311835   Backstage management